Skip To Main Content

NEW Orting Elementary School

Orting Elementary School was built in 1968 and, with the addition in 1977, the school was built to house 290 students. With 530 students in our current care, the lack of permanent space is felt in every aspect of our school.

In this bond, we aim to rebuild Orting Elementary School as a K-5 elementary. This new facility will be constructed on 65 acres the district acquired in 2022 which sits adjacent to Orting High School. With a safer building that reduces 40 entry points down to one main entry and a modern facility that moves 310 students out of portables and into lighter and brighter classrooms, we can ensure our learning spaces accommodate the type of technology, flexible use and collaboration that will set us up for future success.

Anticipated opening if bond passes: Fall 2028